Shelford Heating can design, supply and install your complete bathroom and will manage all the tradesman to ensure a smooth transition from old to new. We employ all our own Plumbers and Heating engineers and when needed utilise resources from a bank of highly skilled and professional contractors many whom have worked for many years with us such as Tilers and Carpenters, Flooring Specialists, Electricians (when our own is too busy) minor building works is also catered for.

Bathrooms of today come in various designs, whether you require Minimalist and Modern, or Traditional and Distinctive – All Bathrooms that we Install will have that Wow Factor and give you many years of Satisfaction and Pleasure when in use – but above all at an affordable price.

Stage 1

We will undertake in consultation with our bathroom Supplier a full design of your new Bathroom, and prepare for your approval a fully costed solution which will include all of the works such as stripping out redundant equipment, removal of tiles, partitions, ceilings  and flooring as required, Preparation and 1st fix of soil and waste system, Hot and Cold Services, Heating Modification and 2nd Fix  Installation of Sanitaryware and Furniture, Electrical works including LED lighting, Heated Mirrors and Shaver Points,  Ventilation Improvements , Plastering, Tiling, and general making good (we do not however undertake decoration) and finishing touches such as Silicone seals.

Stage 2

If possible please view the Bathroom showroom of our Suppliers in Cambridge and any changes to the specification can be made accordingly, we can then change and make amendments to the quoted price, revisit your property to finalise the specification. We Also suggest that you take a look at wall Finishes again our suppliers can offer advice on types of wall finish whether this is Tiled or a Wet Wall System (manufactured composite wall boarding system in varying designs and colour options) Also CTD tile Distributors at Bar Hill can offer lots of choice in wall tiles.

Stage 3

Quote is finalised and Accepted, submit the deposits as written and agree the times for Installation works to commence and forecast of expected completion, We Place orders for Sanitaryware and Furniture ensuring dates can be achieved – generally 3-4 weeks is the lead time for all bathroom Installations. We will undertake a Pre Installation visit with our Supervisor/Installer to reaffirm the intended works and prepare in earnest for our visit.

Stage 4

Installation works commences to programme, is completed to specification and handover of your new Bathroom is completed to your satisfaction. It should be noted that major bathroom changes such as wet floor systems could take as much as 3 weeks to complete from commencements, We will always endeavour to complete our works as intended but it is always wise to allow for a few extra days.  

There are many Manufacturers of high quality bathrooms equipment, we can cater for all tastes and budgets. During our initial discussions we will offer and advise on the many Manufacturer’s and Design Choices.